Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Research on the Process of Pre-Stressing Construction of Suspen-Dome considering Temperature Effect
Suspen-dome is a highly efficient pre-stressing spatial structure. The pre-stressing force in cable has a significant effect on its structural performance. During pre-stressing construction, the temperature variation due to solar radiation and seasonal change might affect the pre-stressing force in cables. However, the construction tensile method which is widely adopted in engineering project does not cope with the effect of temperature change on the cable force. As a result, it is expected that the actual cable force differs from the designed cable force. In this study, the effect of temperature change during pre-stressing construction on pre-stressing force in cable is firstly studied. A significant difference of cable force, up to 212%, is observed between cases considering temperature change and cases not considering temperature change. It is therefore necessary to take the effect of temperature changing on pre-stressing force into account in design of suspen-dome. In this purpose, a new construction pre-stressing control method and a simplified calculation formula are proposed and verified.
Research on the Process of Pre-Stressing Construction of Suspen-Dome considering Temperature Effect
Suspen-dome is a highly efficient pre-stressing spatial structure. The pre-stressing force in cable has a significant effect on its structural performance. During pre-stressing construction, the temperature variation due to solar radiation and seasonal change might affect the pre-stressing force in cables. However, the construction tensile method which is widely adopted in engineering project does not cope with the effect of temperature change on the cable force. As a result, it is expected that the actual cable force differs from the designed cable force. In this study, the effect of temperature change during pre-stressing construction on pre-stressing force in cable is firstly studied. A significant difference of cable force, up to 212%, is observed between cases considering temperature change and cases not considering temperature change. It is therefore necessary to take the effect of temperature changing on pre-stressing force into account in design of suspen-dome. In this purpose, a new construction pre-stressing control method and a simplified calculation formula are proposed and verified.
Research on the Process of Pre-Stressing Construction of Suspen-Dome considering Temperature Effect
Liu, Hongbo (Autor:in) / Chen, Zhihua (Autor:in) / Zhou, Ting (Autor:in)
Advances in Structural Engineering ; 15 ; 489-493
01.03.2012
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Seismic behaviors of suspen-dome structure
British Library Online Contents | 2005
|A novel form analysis method considering pretension process for suspen-dome structures
Online Contents | 2014
|A novel form analysis method considering pretension process for suspen-dome structures
Springer Verlag | 2014
|Research on the Process of Pre-Stressing Construction of Suspen-Dome Considering Temperature Effect
Online Contents | 2012
|Structural Tests of the "Suspen-Dome" System
British Library Conference Proceedings | 1994
|