Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Study on construction technology of bored pile foundation in karst cave and soil cave
Due to the influence of karst cave, soil cave, groundwater and other factors, the construction of bored pile is extremely difficult.Combined with practical engineering, this paper, according to the theory of engineering construction difficulties, using advanced drilling, hole grouting in soluble soil and pile mode control research, adopting the construction technology of better solved the soluble soil hole site with the problem of bored piles, the construction technology of successful application in practical engineering, can provide reference for similar engineering construction.
Study on construction technology of bored pile foundation in karst cave and soil cave
Due to the influence of karst cave, soil cave, groundwater and other factors, the construction of bored pile is extremely difficult.Combined with practical engineering, this paper, according to the theory of engineering construction difficulties, using advanced drilling, hole grouting in soluble soil and pile mode control research, adopting the construction technology of better solved the soluble soil hole site with the problem of bored piles, the construction technology of successful application in practical engineering, can provide reference for similar engineering construction.
Study on construction technology of bored pile foundation in karst cave and soil cave
Mo, Tianfang (Autor:in) / Li, Guangjun (Autor:in) / Zhang, Weixiong (Autor:in) / Deng, Deyuan (Autor:in) / Chen, Zhou (Autor:in) / Wang, Yingtao (Autor:in) / Xu, Hao (Autor:in) / Zong, Hui (Autor:in)
4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021) ; 2021 ; Nanchang,China
Proc. SPIE ; 12080
29.11.2021
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Bored composite pile structure under karst cave/soil cave geological condition
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2021
|Stacked karst cave stratum pile foundation construction method
Europäisches Patentamt | 2022
|Karst cave treatment device for pile foundation construction
Europäisches Patentamt | 2024
|Karst cave pile foundation construction method and device
Europäisches Patentamt | 2023
|