Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Research on early warning of hydropower engineering construction safety accident based on SVM model
There are special dangers in the construction of hydropower projects. Therefore, strengthening the early warning of safety accidents in the construction of hydropower projects, and doing a good job in the safety management and prevention of the construction site are important guarantees for the smooth progress of the construction of hydropower projects. Based on this, based on the SVM model, this paper establishes an early warning index system for hydropower engineering construction safety accidents, builds a hydropower engineering construction safety accident early warning model based on SVM, and discusses the practical application of the SVM-based hydropower engineering construction safety accident early warning model. Finally, it proposes the safety precautions for the construction of hydropower projects aim to provide some useful references and improve the safety management level of hydropower project construction.
Research on early warning of hydropower engineering construction safety accident based on SVM model
There are special dangers in the construction of hydropower projects. Therefore, strengthening the early warning of safety accidents in the construction of hydropower projects, and doing a good job in the safety management and prevention of the construction site are important guarantees for the smooth progress of the construction of hydropower projects. Based on this, based on the SVM model, this paper establishes an early warning index system for hydropower engineering construction safety accidents, builds a hydropower engineering construction safety accident early warning model based on SVM, and discusses the practical application of the SVM-based hydropower engineering construction safety accident early warning model. Finally, it proposes the safety precautions for the construction of hydropower projects aim to provide some useful references and improve the safety management level of hydropower project construction.
Research on early warning of hydropower engineering construction safety accident based on SVM model
Yang, Huacheng (Autor:in)
Second International Conference on Testing Technology and Automation Engineering (TTAE 2022) ; 2022 ; Changchun,China
Proc. SPIE ; 12457
31.10.2022
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Road construction or accident safety warning cursor equipment
Europäisches Patentamt | 2020
|World hydropower engineering and hydropower plant construction
Online Contents | 1967
|World hydropower engineering and hydropower plant construction
Springer Verlag | 1967
|