Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Results of long-term operation of cascade tubular air heaters at the berezovskaya grés
Abstract Experience of operation of tubular air heaters (TAH) on twelve boilers of type PK-38 for 150-MW power units of the Berezovskaya GRÉS (state regional power plant) in Belarus is presented. Coal-fired, gas-fired, and oil-fired operation modes with updating tubular air heaters in a cascade layout are described. Advantages of the cascade layout and conditions for reliable, efficient, and long-term service of the TAH are shown.
Results of long-term operation of cascade tubular air heaters at the berezovskaya grés
Abstract Experience of operation of tubular air heaters (TAH) on twelve boilers of type PK-38 for 150-MW power units of the Berezovskaya GRÉS (state regional power plant) in Belarus is presented. Coal-fired, gas-fired, and oil-fired operation modes with updating tubular air heaters in a cascade layout are described. Advantages of the cascade layout and conditions for reliable, efficient, and long-term service of the TAH are shown.
Results of long-term operation of cascade tubular air heaters at the berezovskaya grés
Shchelokov, V. I. (Autor:in) / Smyshlyaev, A. A. (Autor:in) / Lafa, Yu. I. (Autor:in) / Serik, V. I. (Autor:in)
Power Technology and Engineering ; 38 ; 346-349
01.11.2004
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Online Contents | 2004
|Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Springer Verlag | 2004
|Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Online Contents | 2017
|Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Online Contents | 2017
|British Library Online Contents | 1992