Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Central Brae Project Retrofit Riser Installation
Abstract The Brae field, discovered in 1975, is located in block 16/7 about 42 nautical miles north west of the Occidental Piper field and 70 nautical miles of the BP Forties field. The Brae ‘A’ platform was installed in 1982. First oil was exported in July 1983 and production rates of around 100,000 barrels per day have been achieved.
The Central Brae Project Retrofit Riser Installation
Abstract The Brae field, discovered in 1975, is located in block 16/7 about 42 nautical miles north west of the Occidental Piper field and 70 nautical miles of the BP Forties field. The Brae ‘A’ platform was installed in 1982. First oil was exported in July 1983 and production rates of around 100,000 barrels per day have been achieved.
The Central Brae Project Retrofit Riser Installation
Farrow, R. (Autor:in) / Cresswell, N. (Autor:in)
01.01.1990
13 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Elsevier | 1992
|Installation aspects of flexible riser systems
Elsevier | 1989
|Project Journal - Ongoing series on a hospital central plant retrofit
Online Contents | 2003
SWEDEN - Diverless bend stiffener connector eases riser installation
Online Contents | 2009