Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Greenfield Settlement of KVMRT SSP Line 2 in Kuala Lumpur Limestone Formation
Significant growth have been achieved in many major cities around the world. The demand of better connectivity through various transportation infrastructure has led to ever more reliance to underground space such as tunnels. Hence engineering-wise, a more reliable design reference will provide better ground movement estimation from the ground excavation. The instrument monitoring data for the Klang Valley Mass Rapid Transit (KVMRT-SSP) Line 2, Malaysia in Kuala Lumpur Limestone formation is presented in this paper to assess the magnitude of ground movement during tunnelling works. Back calculation of settlement trough width parameter, K and volume loss, VL are presented in this paper. Based on 13 arrays of ground settlement markers (GSM) records, the averaged back-calculated K is 0.9 whereas VL ranges from 0.16% to 0.21%. The information is useful for future tunnelling especially of similar ground characteristics in estimation of ground movement.
Greenfield Settlement of KVMRT SSP Line 2 in Kuala Lumpur Limestone Formation
Significant growth have been achieved in many major cities around the world. The demand of better connectivity through various transportation infrastructure has led to ever more reliance to underground space such as tunnels. Hence engineering-wise, a more reliable design reference will provide better ground movement estimation from the ground excavation. The instrument monitoring data for the Klang Valley Mass Rapid Transit (KVMRT-SSP) Line 2, Malaysia in Kuala Lumpur Limestone formation is presented in this paper to assess the magnitude of ground movement during tunnelling works. Back calculation of settlement trough width parameter, K and volume loss, VL are presented in this paper. Based on 13 arrays of ground settlement markers (GSM) records, the averaged back-calculated K is 0.9 whereas VL ranges from 0.16% to 0.21%. The information is useful for future tunnelling especially of similar ground characteristics in estimation of ground movement.
Greenfield Settlement of KVMRT SSP Line 2 in Kuala Lumpur Limestone Formation
Lecture Notes in Civil Engineering
Mohammed, Bashar S. (Herausgeber:in) / Shafiq, Nasir (Herausgeber:in) / Rahman M. Kutty, Shamsul (Herausgeber:in) / Mohamad, Hisham (Herausgeber:in) / Balogun, Abdul-Lateef (Herausgeber:in) / Azhari, Noor Azlina (Autor:in) / Mohamad, Hisham (Autor:in)
Proceedings of the International Conference on Civil, Offshore and Environmental Engineering ; 2021 ; Kuching, Malaysia
01.01.2021
8 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Engineering Characterisation of Kuala Lumpur Granite and Limestone
Springer Verlag | 2016
|British Library Online Contents | 1999
Online Contents | 1998
|Kuala Lumpur Monorail Line Fleet Extension
British Library Conference Proceedings | 2013
|