Exclusion of Non-value Efforts in Construction Projects
An effort that adds non-value (ENV) could be saved if the project had been better planned, conducted, monitored, and regulated. To recognize and reduce ENV in micro-level analysis such as sampling of works and balance charts explaining the balance of the asset is used broadly. These methods are particularly successful when analyzing operations with modest performance variance in each cycle and can discover redundant stages in highly repetitive building activity. Data is gathered through literature reviews and site visits. The main aim of this study is to construct a dynamic tool that can detect and enumerate ENV, and changes can be done in the design. This proposed model was then used in two case studies, it was discovered that errors and changes caused 18.61% ENV and if the project is delayed, there will be a delay of 128 days in the case of project I and 72 days in case project II. Furthermore, productivity loss and Interruption (RFIR) form the major part of ENV, causing delays in both the case studies. Based on the findings, this research stated that this proposed tool could be used as a device to improve ENV comprehension in projects, resulting in a more significant reduction in ENV.
Exclusion of Non-value Efforts in Construction Projects
An effort that adds non-value (ENV) could be saved if the project had been better planned, conducted, monitored, and regulated. To recognize and reduce ENV in micro-level analysis such as sampling of works and balance charts explaining the balance of the asset is used broadly. These methods are particularly successful when analyzing operations with modest performance variance in each cycle and can discover redundant stages in highly repetitive building activity. Data is gathered through literature reviews and site visits. The main aim of this study is to construct a dynamic tool that can detect and enumerate ENV, and changes can be done in the design. This proposed model was then used in two case studies, it was discovered that errors and changes caused 18.61% ENV and if the project is delayed, there will be a delay of 128 days in the case of project I and 72 days in case project II. Furthermore, productivity loss and Interruption (RFIR) form the major part of ENV, causing delays in both the case studies. Based on the findings, this research stated that this proposed tool could be used as a device to improve ENV comprehension in projects, resulting in a more significant reduction in ENV.
Exclusion of Non-value Efforts in Construction Projects
Lecture Notes in Civil Engineering
Nandagiri, Lakshman (Herausgeber:in) / Narasimhan, M. C. (Herausgeber:in) / Marathe, Shriram (Herausgeber:in) / Deepak, M. S. (Autor:in) / Beulah Gnana Ananthi, G. (Autor:in) / Ekbote, Anupkumar G. (Autor:in) / Raj, Rithika (Autor:in)
International Conference on Civil Engineering Trends and Challenges for Sustainability ; 2021
27.06.2022
28 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Value management of construction projects
UB Braunschweig | 2015
|Value management of construction projects
TIBKAT | 2015
|Value management of construction projects
TIBKAT | 2015
|Best Value Approach (BVA) - Enhancing Value Creation in Construction Projects
BASE | 2017
|