Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Abstract In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects have met delays and cost overruns. This research has employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. Twenty one causes of delay and cost overruns appropriate with building and industrial construction project were inferred and ranked with respect to frequency, severity and importance indices. Spearman’s rank correlation tests showed that there are no differences in the viewpoints between three principal parties in the project. A comparison of causes of time and cost overruns was done with various selected construction industries in Asia and Africa. Factor analysis technique was applied to categorize the causes, which yielded 7 factors: Slowness and Lack of constraint; Incompetence; Design; Market and Estimate; Financial capability; Government; and Worker. These findings might encourage practitioners to focus on delay and cost overruns problem that might have existed in their present or future projects.
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Abstract In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects have met delays and cost overruns. This research has employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. Twenty one causes of delay and cost overruns appropriate with building and industrial construction project were inferred and ranked with respect to frequency, severity and importance indices. Spearman’s rank correlation tests showed that there are no differences in the viewpoints between three principal parties in the project. A comparison of causes of time and cost overruns was done with various selected construction industries in Asia and Africa. Factor analysis technique was applied to categorize the causes, which yielded 7 factors: Slowness and Lack of constraint; Incompetence; Design; Market and Estimate; Financial capability; Government; and Worker. These findings might encourage practitioners to focus on delay and cost overruns problem that might have existed in their present or future projects.
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Le-Hoai, Long (Autor:in) / Lee, Young Dai (Autor:in) / Lee, Jun Yong (Autor:in)
KSCE Journal of Civil Engineering ; 12 ; 367-377
01.11.2008
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Investigating cost overruns and delay in urban construction projects in Iran
Taylor & Francis Verlag | 2021
|DOAJ | 2024
|Significant Factors Causing Delay and Cost Overruns in Construction of Groundwater Projects in Ghana
Online Contents | 2003
|Imperative Causes of Cost Overruns and Delay in Construction of Groundwater Projects in Nigeria
BASE | 2021
|