Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Conclusion The scheme developed for operating high-head segmented gates on eccentric supports by means of temporary installations, as has been highly recommended, may also be employed on other construction projects in similar situations.
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Conclusion The scheme developed for operating high-head segmented gates on eccentric supports by means of temporary installations, as has been highly recommended, may also be employed on other construction projects in similar situations.
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Sevenard, Yu. K. (Autor:in) / Nikolaev, B. A. (Autor:in) / Redchenko, I. S. (Autor:in) / Svintsov, F. F. (Autor:in) / Chobanis, Ya. G. (Autor:in) / Chernovol, N. A. (Autor:in)
Hydrotechnical Construction ; 13 ; 637-640
01.07.1979
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Online Contents | 1979
|Nurek hydroelectric development on the Vakhsh River
Springer Verlag | 1969
|Construction of the Nurek hydroelectric station penstocks
Springer Verlag | 1972
|Construction of the Nurek hydroelectric station penstocks
Online Contents | 1972
|