Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Exploring the failure factors of Yemen construction industry using PLS-SEM approach
Yemen construction industry has faced significant declination and failure since the political unrest in 2011. The industry development has been suspended, and most of the projects failed to complete. Several factors have significantly contributed to the collapse of the industry. The factors have been identified from the literature and are assessed and applied to the Yemeni construction industry. Therefore, this study aims to use the partial least square-structural equation modeling (PLS-SEM) approach to investigate and determine the relationships between the factors causing failure to the Yemen construction industry. The structural model was developed and evaluated using SMART-PLS, and the data collected for the model were collected using a questionnaire survey. A total of 62 critical failure factors were identified and assessed by construction practitioners using a 5-point Likert-type scale. These factors were categorized into five groups using factor analysis and these groups are called independent and the dependent variable is a failure of Yemen construction. The developed structural model was thoroughly assessed for both of its component’s measurement and structural model. The model shows that factors under the group of Governmental and Administrative Related Factors have the most substantial impact on causing failure to the Yemen construction industry. The model serves best to the construction industry practitioners and policymakers to understand the causes of failure and consider strategies to rehabilitate the industry.
Exploring the failure factors of Yemen construction industry using PLS-SEM approach
Yemen construction industry has faced significant declination and failure since the political unrest in 2011. The industry development has been suspended, and most of the projects failed to complete. Several factors have significantly contributed to the collapse of the industry. The factors have been identified from the literature and are assessed and applied to the Yemeni construction industry. Therefore, this study aims to use the partial least square-structural equation modeling (PLS-SEM) approach to investigate and determine the relationships between the factors causing failure to the Yemen construction industry. The structural model was developed and evaluated using SMART-PLS, and the data collected for the model were collected using a questionnaire survey. A total of 62 critical failure factors were identified and assessed by construction practitioners using a 5-point Likert-type scale. These factors were categorized into five groups using factor analysis and these groups are called independent and the dependent variable is a failure of Yemen construction. The developed structural model was thoroughly assessed for both of its component’s measurement and structural model. The model shows that factors under the group of Governmental and Administrative Related Factors have the most substantial impact on causing failure to the Yemen construction industry. The model serves best to the construction industry practitioners and policymakers to understand the causes of failure and consider strategies to rehabilitate the industry.
Exploring the failure factors of Yemen construction industry using PLS-SEM approach
Asian J Civ Eng
Gamil, Yaser (Autor:in) / Rahman, Ismail Abdul (Autor:in) / Nagapan, Sasitharan (Autor:in) / Nasaruddin, Nur Ain Ngah (Autor:in)
Asian Journal of Civil Engineering ; 21 ; 967-975
01.09.2020
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Assessment of critical factors contributing to construction failure in Yemen
Taylor & Francis Verlag | 2020
|Factors affecting construction labour productivity in Yemen
Taylor & Francis Verlag | 2019
|DataCite | 2015
|