Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experience with operation of hydraulic structures at the 50th anniversary of the Great October Bratsk hydroelectric plant
Conclusions The experience with the first years of operation of the Bratsk hydroelectric plant indicates that its hydraulic structures are in good condition. In order to ensure a reliable long-term operation of the structures and to improve the supervision conditions it is necessary to carry out certain major measures, which are beyond the scope of the routine operation maintenance. These measures are determined by the local operation characteristics of certain portions of the structures, which are partially related to changes introduced in the project during construction. Some of the work being carried out at the present time, such as the application of consolidation grouting in the foundations of the first pillars of the concrere dam, is the result of deficient designs resulting from inadequacy of our concepts about the combined action of the dam and the contact zone of the diabase rock foundation. Further observations will reveal how effective are the measures adopted during operation. The data presented in this article of the experience with the first years of operation of the hydraulic structures of the Bratsk hydroelectric plant should be taken into account in the design of similar structures.
Experience with operation of hydraulic structures at the 50th anniversary of the Great October Bratsk hydroelectric plant
Conclusions The experience with the first years of operation of the Bratsk hydroelectric plant indicates that its hydraulic structures are in good condition. In order to ensure a reliable long-term operation of the structures and to improve the supervision conditions it is necessary to carry out certain major measures, which are beyond the scope of the routine operation maintenance. These measures are determined by the local operation characteristics of certain portions of the structures, which are partially related to changes introduced in the project during construction. Some of the work being carried out at the present time, such as the application of consolidation grouting in the foundations of the first pillars of the concrere dam, is the result of deficient designs resulting from inadequacy of our concepts about the combined action of the dam and the contact zone of the diabase rock foundation. Further observations will reveal how effective are the measures adopted during operation. The data presented in this article of the experience with the first years of operation of the hydraulic structures of the Bratsk hydroelectric plant should be taken into account in the design of similar structures.
Experience with operation of hydraulic structures at the 50th anniversary of the Great October Bratsk hydroelectric plant
Knyazev, K. A. (Autor:in) / Éidel’man, S. Ya. (Autor:in)
Hydrotechnical Construction ; 7 ; 1165-1171
01.12.1973
7 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A book about the great October 50th anniversary Bratsk hydroelectric plant
Springer Verlag | 1972
|A book about the great October 50th anniversary Bratsk hydroelectric plant
Online Contents | 1972
|