Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Preparations Before Construction
This chapter introduces the necessary preparation work before the pipeline rehabilitation construction being carried out. It includes four parts. Firstly, the general provisions about the pipeline rehabilitation construction have been introduced briefly. Then the site investigation, underground pipeline detection and construction site preparation have been introduced in details, respectively.
Preparations Before Construction
This chapter introduces the necessary preparation work before the pipeline rehabilitation construction being carried out. It includes four parts. Firstly, the general provisions about the pipeline rehabilitation construction have been introduced briefly. Then the site investigation, underground pipeline detection and construction site preparation have been introduced in details, respectively.
Preparations Before Construction
Wang, Lu (Autor:in) / Yan, Chunwen (Autor:in) / Xu, Junyu (Autor:in)
Technology Standard of Pipe Rehabilitation ; Kapitel: 8 ; 37-40
13.02.2021
4 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Wiley | 2009
|Preliminary preparations for the construction of the Kolyma hydroelectric station
Springer Verlag | 1974
|Preliminary preparations for the construction of the Kolyma hydroelectric station
Online Contents | 1974
|Building construction before mechanization
TIBKAT | 1986
|British Library Online Contents | 2008