Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Distribution of Capital Investments in the Construction Process for Multifunctional Buildings
There are the distribution of enlarged indicators costs for the multifunctional business center with a hotel and sports complex in Nizhny Novgorod. This facility was designed for the 2018 FIFA World Cup hosted by the Russian Federation. Construction period lasted four years starting in 2014. Authors have described the distribution of various stages total costs for this type of buildings. Researchers have investigated the estimated costs of salary fund and materials sections for all multifunctional building construction’s stages. Authors have deeply analyzed the capital costs for engineering parts of this type of building. The most expensive engineering systems were identified and described by researchers in field of salary fund and purchasing equipment and materials sections. Authors have described the modern and promising ways to improve the comfort and environmental friendliness of civil and industrial buildings. There is the description of additional costs for modern devices which are included in the other low electric systems section. The main trends in improving area of building engineering system efficiency were outlined in this paper. Also, there are the trends in improving field of building’s enclosing structures. This article will be of interest for economists, developers and investment companies that are involved in assessing the cost of capital investments to multifunctional buildings construction process with various purposes.
The Distribution of Capital Investments in the Construction Process for Multifunctional Buildings
There are the distribution of enlarged indicators costs for the multifunctional business center with a hotel and sports complex in Nizhny Novgorod. This facility was designed for the 2018 FIFA World Cup hosted by the Russian Federation. Construction period lasted four years starting in 2014. Authors have described the distribution of various stages total costs for this type of buildings. Researchers have investigated the estimated costs of salary fund and materials sections for all multifunctional building construction’s stages. Authors have deeply analyzed the capital costs for engineering parts of this type of building. The most expensive engineering systems were identified and described by researchers in field of salary fund and purchasing equipment and materials sections. Authors have described the modern and promising ways to improve the comfort and environmental friendliness of civil and industrial buildings. There is the description of additional costs for modern devices which are included in the other low electric systems section. The main trends in improving area of building engineering system efficiency were outlined in this paper. Also, there are the trends in improving field of building’s enclosing structures. This article will be of interest for economists, developers and investment companies that are involved in assessing the cost of capital investments to multifunctional buildings construction process with various purposes.
The Distribution of Capital Investments in the Construction Process for Multifunctional Buildings
Lecture Notes in Civil Engineering
Ginzburg, Alexander (Herausgeber:in) / Galina, Kashevarova (Herausgeber:in) / Razakov, M. A. (Autor:in) / Gorbenko, A. V. (Autor:in) / Sartekenova, S. A. (Autor:in) / Razakova, R. V. (Autor:in)
Building Life-cycle Management. Information Systems and Technologies ; Kapitel: 43 ; 415-423
10.04.2022
9 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Optimizing Capital Investments in Construction
ASCE | 2021
|Multifunctional commercial buildings in steel and composite construction
British Library Conference Proceedings | 2017
|