Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Instrumentation Calibration Reduction Program (ICRP) at Northeast Utilities
Abstract The desire to substitute some program for the “Calibration” of the Core Exit Thermocouple (CET’s) at Millstone 3 (MP3) prompted Northeast Utilities (NU) to fund a project to study the feasibility of determining the state of CET calibration without having to have direct access to the CET’s. The project, carried out by WYTEK and Northeast Utilities, was commenced in October, 1986 and just recently completed. Although the CET’s were the prime focus, other safety related sensors were investigated as well. This paper describes presumptions and methods employed in the first phase, the feasibility study. Additionally, it describes the cost/benefit analysis which can be used by any utility to determine ICRP payback.
The Instrumentation Calibration Reduction Program (ICRP) at Northeast Utilities
Abstract The desire to substitute some program for the “Calibration” of the Core Exit Thermocouple (CET’s) at Millstone 3 (MP3) prompted Northeast Utilities (NU) to fund a project to study the feasibility of determining the state of CET calibration without having to have direct access to the CET’s. The project, carried out by WYTEK and Northeast Utilities, was commenced in October, 1986 and just recently completed. Although the CET’s were the prime focus, other safety related sensors were investigated as well. This paper describes presumptions and methods employed in the first phase, the feasibility study. Additionally, it describes the cost/benefit analysis which can be used by any utility to determine ICRP payback.
The Instrumentation Calibration Reduction Program (ICRP) at Northeast Utilities
Wyckoff, Richard (Autor:in) / Blanch, Paul (Autor:in)
01.01.1988
9 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Northeast utilities, spectra to expand pipeline
Online Contents | 2014
Applying Smart Instrumentation to Water Utilities
British Library Conference Proceedings | 1997
|Calibration of VXI Instrumentation
British Library Conference Proceedings | 1996
|Commentary: Manageability, the clue to the ICRP radon approach
Online Contents | 1996
|Commentary: Control of exposure to natural radiation: An ICRP perspective
Online Contents | 1996
|