Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Abstract Managerial, administrative, financial and technical information must be effectively translated into ‘marketing’ language to persuade client organisations to allocate adequate finance for bridges on the required time schedule. Clients must produce policies and objectives for maintenance, improvement and replacement. Programmes of work and priorities will evolve from inspection and assessment information. Expenditure estimates will then enable programme revision as per financial constraints using relevant database and information systems. Validity of traffic predictions must be checked and quality assurance systems applied to design, specifications and construction. Behaviour monitoring information has an important role to play, hence the urgent need to improve instrumentation and techniques. If bridge management is a coin, ‘heads’ is the marketing dealt with in this paper and ‘tails’ is the production or inspection, assessment, maintenance and repair work (Fig. 1).
Abstract Managerial, administrative, financial and technical information must be effectively translated into ‘marketing’ language to persuade client organisations to allocate adequate finance for bridges on the required time schedule. Clients must produce policies and objectives for maintenance, improvement and replacement. Programmes of work and priorities will evolve from inspection and assessment information. Expenditure estimates will then enable programme revision as per financial constraints using relevant database and information systems. Validity of traffic predictions must be checked and quality assurance systems applied to design, specifications and construction. Behaviour monitoring information has an important role to play, hence the urgent need to improve instrumentation and techniques. If bridge management is a coin, ‘heads’ is the marketing dealt with in this paper and ‘tails’ is the production or inspection, assessment, maintenance and repair work (Fig. 1).
Highway Bridge Management
Maxwell, John W. S. (Autor:in)
Bridge Management ; 113-120
01.01.1990
8 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Engineering Index Backfile | 1894
Highway bridge maintenance management and maintenance device
Europäisches Patentamt | 2022
|