Risk evaluation of tunneling projects
Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project.
Risk evaluation of tunneling projects
Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project.
Risk evaluation of tunneling projects
Archiv.Civ.Mech.Eng
Fouladgar, M. M. (Autor:in) / Yazdani-Chamzini, A. (Autor:in) / Zavadskas, E. K. (Autor:in)
Archives of Civil and Mechanical Engineering ; 12 ; 1-12
01.03.2012
12 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Risk evaluation of tunneling projects
British Library Online Contents | 2012
|Risk analysis for tunneling projects using Bayesian Networks
British Library Conference Proceedings | 2007
|