Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experiment to Determine Worker Needs Index in Brick Work with Space Mold Tools
Indonesian people are experiencing a huge backlog of decent housing. The data shows that almost a third of the houses in Indonesia are categorized as unfit for housing. This means the backlog can reach 22 million homes. This number continues to grow along with population growth and insufficient supply of livable homes. With these conditions, Indonesian people must increase the construction of livable homes. Brick wall houses are increasingly in demand by the community. Based on the government's program to increase the production of livable homes, the productivity of works in the construction of these houses must also be increased. One way to increase productivity is to use equipment that can speed up the process of installing spaces (mortar). For this reason, it is necessary to experiment with the use of these spacing molds in brick work. The purpose of this research was to determine the worker’s need on the work of masonry wall with mortar spacing molds. The benefit that can be taken from this research is that the results can be used as a reference for construction services in estimating the productivity of laborers. With the increased productivity of this work, it is expected to help overcome the problem of the backlog. The experimental research object is the labor productivity of the couple’s brick work. The research sample is a worker who works on residential development in Sleman, Yogyakarta. The data of this research are the results of the total time and effective time of the work of masonry performed by 18 masons. The calculation of work time is expressed in units of seconds. The production unit takes 70 bricks which is equivalent to 1 m2. In conclusion, the index of need for workers on brick wall pair work is 0.7. The need was validated by t-test which showed that the use of this mortar spacing tool significantly increased productivity. Therefore, to improve the productivity of masons in the work of masonry spaced molding tools should be used.
Experiment to Determine Worker Needs Index in Brick Work with Space Mold Tools
Indonesian people are experiencing a huge backlog of decent housing. The data shows that almost a third of the houses in Indonesia are categorized as unfit for housing. This means the backlog can reach 22 million homes. This number continues to grow along with population growth and insufficient supply of livable homes. With these conditions, Indonesian people must increase the construction of livable homes. Brick wall houses are increasingly in demand by the community. Based on the government's program to increase the production of livable homes, the productivity of works in the construction of these houses must also be increased. One way to increase productivity is to use equipment that can speed up the process of installing spaces (mortar). For this reason, it is necessary to experiment with the use of these spacing molds in brick work. The purpose of this research was to determine the worker’s need on the work of masonry wall with mortar spacing molds. The benefit that can be taken from this research is that the results can be used as a reference for construction services in estimating the productivity of laborers. With the increased productivity of this work, it is expected to help overcome the problem of the backlog. The experimental research object is the labor productivity of the couple’s brick work. The research sample is a worker who works on residential development in Sleman, Yogyakarta. The data of this research are the results of the total time and effective time of the work of masonry performed by 18 masons. The calculation of work time is expressed in units of seconds. The production unit takes 70 bricks which is equivalent to 1 m2. In conclusion, the index of need for workers on brick wall pair work is 0.7. The need was validated by t-test which showed that the use of this mortar spacing tool significantly increased productivity. Therefore, to improve the productivity of masons in the work of masonry spaced molding tools should be used.
Experiment to Determine Worker Needs Index in Brick Work with Space Mold Tools
Lecture Notes in Civil Engineering
Belayutham, Sheila (Herausgeber:in) / Che Ibrahim, Che Khairil Izam (Herausgeber:in) / Alisibramulisi, Anizahyati (Herausgeber:in) / Mansor, Hazrina (Herausgeber:in) / Billah, Muntasir (Herausgeber:in) / Musyafa’, Albani (Autor:in) / Ansori, Irsyad Hanif (Autor:in) / Anugrah, Muchammad Rizky (Autor:in)
International Conference on Sustainable Civil Engineering Structures and Construction Materials ; 2020
07.04.2022
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
AGING WORKER PERCEPTIONS ABOUT DESIGN AND PRIVACY NEEDS FOR WORK
British Library Online Contents | 2001
|Engineering Index Backfile | 1937
|Europäisches Patentamt | 2024
|