Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Railway Anji-Kahad Bridge in the Indian Kashmire Region
A 300 km in length railway is under construction in the Jammu-Kashmire region and due to morphology of the area, 90 km of tunnels and several important bridges are required along the line; among them, one will cross the Anji valley at 190 m above the river. It is a cable stayed bridge with a major span of 290 m, a composite steel-concrete truss deck and a 200 m in height single concrete tower the top of which will be at 390 m from the bottom of the valley. The rear stay cables are anchored to both the rear span and to a 43 × 15 × 21 m concrete ballast element. The project will be briefly described including the tests performed in the POLIMI wind tunnel and the construction progress.
The Railway Anji-Kahad Bridge in the Indian Kashmire Region
A 300 km in length railway is under construction in the Jammu-Kashmire region and due to morphology of the area, 90 km of tunnels and several important bridges are required along the line; among them, one will cross the Anji valley at 190 m above the river. It is a cable stayed bridge with a major span of 290 m, a composite steel-concrete truss deck and a 200 m in height single concrete tower the top of which will be at 390 m from the bottom of the valley. The rear stay cables are anchored to both the rear span and to a 43 × 15 × 21 m concrete ballast element. The project will be briefly described including the tests performed in the POLIMI wind tunnel and the construction progress.
The Railway Anji-Kahad Bridge in the Indian Kashmire Region
Lecture Notes in Civil Engineering
di Prisco, Marco (Herausgeber:in) / Menegotto, Marco (Herausgeber:in) / Petrangeli, Mario P. (Autor:in) / Vittozzi, Angelo (Autor:in) / Polastri, Andrea (Autor:in) / Guerci, Dario (Autor:in)
Italian Concrete Conference ; 2021 ; Naples, Italy
10.09.2023
15 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
The Tower of Cable Stayed Railway Bridge Over Anji River
Springer Verlag | 2023
|Innovation packaging design of Anji dried bamboo shoots
IEEE | 2010
|Flood Risk Assessment of Buildings Based on Vulnerability Curve: A Case Study in Anji County
DOAJ | 2022
|New Indian railway bridge crossing tributary of Sutlej River
Engineering Index Backfile | 1948
|The reconstruction of Koari Bridge, Great Indian Peninsula Railway
Engineering Index Backfile | 1917
|