Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Targeted Asset Management on Ageing UK Railway Embankments—Wrabness
To prioritise and optimise mitigation with sustainable and value engineered solutions, a targeted asset management (TAM) regime has been established. The early stages have been successfully implemented at an embankment site at Wrabness in Essex which has experienced long-term instability issues. The site is located on sidelong ground leading to the Stour estuary with evidence of natural mass movement and drainage issues. Temporary mitigation, including local toe weighting and drainage improvements, has helped to control slope movements. Detailed geomorphological mapping, interrogation of ground investigation data, slope instrumentation data, and review of track monitoring data have allowed development of good ground models and understanding of geotechnical issues. Early ecology surveys, upfront preliminary designs and site risk zonation have enabled network rail to plan budgets and decide on the works in each five yearly funding cycle.
Targeted Asset Management on Ageing UK Railway Embankments—Wrabness
To prioritise and optimise mitigation with sustainable and value engineered solutions, a targeted asset management (TAM) regime has been established. The early stages have been successfully implemented at an embankment site at Wrabness in Essex which has experienced long-term instability issues. The site is located on sidelong ground leading to the Stour estuary with evidence of natural mass movement and drainage issues. Temporary mitigation, including local toe weighting and drainage improvements, has helped to control slope movements. Detailed geomorphological mapping, interrogation of ground investigation data, slope instrumentation data, and review of track monitoring data have allowed development of good ground models and understanding of geotechnical issues. Early ecology surveys, upfront preliminary designs and site risk zonation have enabled network rail to plan budgets and decide on the works in each five yearly funding cycle.
Targeted Asset Management on Ageing UK Railway Embankments—Wrabness
Lecture Notes in Civil Engineering
Tutumluer, Erol (Herausgeber:in) / Nazarian, Soheil (Herausgeber:in) / Al-Qadi, Imad (Herausgeber:in) / Qamhia, Issam I.A. (Herausgeber:in) / Payne, Ian (Autor:in) / Holt, Simon (Autor:in) / Griffiths, Isaac (Autor:in) / Fielder, Stuart (Autor:in)
17.09.2021
14 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Towards an asset management system for railway embankments and cuttings
British Library Conference Proceedings | 2001
|The protection of railway embankments
Engineering Index Backfile | 1912
|RETROFIT EARTHWORKS TO UNSTABLE RAILWAY EMBANKMENTS
British Library Conference Proceedings | 2002
|Ground improvement techniques for railway embankments
British Library Online Contents | 2009
|