Reactive Procedure for Robust Project Scheduling under the Activity Disruptions
The baseline schedule may become infeasible when disruptions happen during the execution of project. This will lead to project delays and financial losses. In this paper, we developed a robust reactive optimization model. Our objective is to maximize the robustness of reactive schedule. Moreover, a robust reactive procedure is proposed for baseline schedule under a series of disruptions caused by activity duration. To test the proposed approach, sets of J60 and J90 instances from the Project Scheduling Library (PSPLIB) were used. Meanwhile, we tested the reactive project scheduling with the aim of minimizing makespan and compared the maximal robustness reactive schedule and the minimal makespan reactive schedule. We developed a reactive procedure involving genetic algorithm for reactive scheduling due to its non-deterministic polynomial hard (NP-hard). The results indicated that robust reactive scheduling has the advantage in maintaining the schedule’s ability of tolerating variabilities and reducing the impact of activity disruptions on the makespan. The research results can help project managers develop a robust schedule which can tolerate variabilities in a random environment.
Reactive Procedure for Robust Project Scheduling under the Activity Disruptions
The baseline schedule may become infeasible when disruptions happen during the execution of project. This will lead to project delays and financial losses. In this paper, we developed a robust reactive optimization model. Our objective is to maximize the robustness of reactive schedule. Moreover, a robust reactive procedure is proposed for baseline schedule under a series of disruptions caused by activity duration. To test the proposed approach, sets of J60 and J90 instances from the Project Scheduling Library (PSPLIB) were used. Meanwhile, we tested the reactive project scheduling with the aim of minimizing makespan and compared the maximal robustness reactive schedule and the minimal makespan reactive schedule. We developed a reactive procedure involving genetic algorithm for reactive scheduling due to its non-deterministic polynomial hard (NP-hard). The results indicated that robust reactive scheduling has the advantage in maintaining the schedule’s ability of tolerating variabilities and reducing the impact of activity disruptions on the makespan. The research results can help project managers develop a robust schedule which can tolerate variabilities in a random environment.
Reactive Procedure for Robust Project Scheduling under the Activity Disruptions
KSCE J Civ Eng
Li, Lei (Autor:in) / Liu, Wanlin (Autor:in) / Chen, Yumeng (Autor:in) / Yang, Shun (Autor:in)
KSCE Journal of Civil Engineering ; 25 ; 3213-3222
01.09.2021
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
The roles of partnering and boundary activities on project resilience under disruptions
DOAJ | 2024
|BASE | 2021
|Identifying Factors for Statistical Models to Measure Highway Project Disruptions
British Library Conference Proceedings | 2005
|IN-DEPTH, LITERATURE-DRIVEN ANALYSIS OF CONSTRUCTION PROJECT DISRUPTIONS CATEGORIZED BY REGION
TIBKAT | 2022
|Disruptions, analogies and reflections
SAGE Publications | 2023
|