Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction projects of the 10th five-year plan — Startup scheme for the Zeya hydroelectric plant
Construction projects of the 10th five-year plan — Startup scheme for the Zeya hydroelectric plant
Construction projects of the 10th five-year plan — Startup scheme for the Zeya hydroelectric plant
Vagner, V. N. (Autor:in) / Sivakova, E. G. (Autor:in) / Teleshev, V. I. (Autor:in)
Hydrotechnical Construction ; 10 ; 530-535
01.06.1976
6 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Construction projects of the 10th five-year plan — Startup scheme for the Zeya hydroelectric plant
Online Contents | 1976
|Closing the Zeya River for construction of the Zeya hydroelectric power station
Online Contents | 1975
|Closing the Zeya River for construction of the Zeya hydroelectric power station
Springer Verlag | 1975
|First-stage cofferdams at the zeya hydroelectric plant
Springer Verlag | 1973
|First-stage cofferdams at the zeya hydroelectric plant
Online Contents | 1973
|