Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
Abstract Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
Abstract Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
Toğan, Vedat (Autor:in) / Eirgash, M. Azim (Autor:in)
KSCE Journal of Civil Engineering ; 23 ; 10-20
03.12.2018
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
Online Contents | 2019
|Genetic Algorithms in the Time-Cost Trade-Off Optimization of Construction Projects
British Library Conference Proceedings | 2008
|Development of time–cost trade-off optimization model for construction projects with MOPSO technique
Springer Verlag | 2024
|Development of time–cost trade-off optimization model for construction projects with MOPSO technique
Springer Verlag | 2024
|Time-cost optimization using harmony search algorithm in construction projects
BASE | 2019
|