Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
This study investigates the impacts of using different objective functions in leveling resources in schedules established by using Line-Of-Balance (LOB) methodology. A genetic algorithm-based model that considers different objective functions was used for leveling resources in LOB schedules. This model uses the principles of “optimum crew size” and “natural rhythm” that assume that the highest productivity can be achieved as long as an activity is performed in a unit of production by one or multiple crews of optimum size. Therefore, one needs to change the number of crews employed to shift the start times of an activity forwards or backwards at different units of production. The total project duration, the duration of an activity in any unit and the precedence relationships between activities remain the same during this procedure. Two LOB schedules are established for a pipeline project and are used to investigate the impacts of using different objective functions for resource leveling in LOB. It was observed that the objective functions provided the same optimal resource distribution. However, prudent schedulers should consider all ten objective functions because the distribution of resources depends on the number of activities, the float of each activity, and the precedence relationships between activities.
Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
This study investigates the impacts of using different objective functions in leveling resources in schedules established by using Line-Of-Balance (LOB) methodology. A genetic algorithm-based model that considers different objective functions was used for leveling resources in LOB schedules. This model uses the principles of “optimum crew size” and “natural rhythm” that assume that the highest productivity can be achieved as long as an activity is performed in a unit of production by one or multiple crews of optimum size. Therefore, one needs to change the number of crews employed to shift the start times of an activity forwards or backwards at different units of production. The total project duration, the duration of an activity in any unit and the precedence relationships between activities remain the same during this procedure. Two LOB schedules are established for a pipeline project and are used to investigate the impacts of using different objective functions for resource leveling in LOB. It was observed that the objective functions provided the same optimal resource distribution. However, prudent schedulers should consider all ten objective functions because the distribution of resources depends on the number of activities, the float of each activity, and the precedence relationships between activities.
Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
KSCE J Civ Eng
Damci, Atilla (Autor:in) / Arditi, David (Autor:in) / Polat, Gul (Autor:in)
KSCE Journal of Civil Engineering ; 20 ; 58-67
01.01.2016
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
Online Contents | 2016
|Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
Springer Verlag | 2016
|Resource Leveling in Line‐of‐Balance Scheduling
Online Contents | 2013
|Resource Leveling in Line‐of‐Balance Scheduling
Wiley | 2013
|Impacts of different objective functions on resource leveling in construction projects: a case study
DOAJ | 2014
|