Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improvement of underground hydraulic construction during the 10th five-year plan
Improvement of underground hydraulic construction during the 10th five-year plan
Improvement of underground hydraulic construction during the 10th five-year plan
Kuperman, V. L. (Autor:in) / Mazur, A. M. (Autor:in) / Mostkov, V. M. (Autor:in)
Hydrotechnical Construction ; 10 ; 850-854
01.09.1976
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Improvement of underground hydraulic construction during the 10th five-year plan
Online Contents | 1976
|Hydropower of the USSR in the 10th five-year plan
Online Contents | 1976
Hydropower of the USSR in the 10th five-year plan
Springer Verlag | 1976
Construction projects of the 10th five-year plan — Startup scheme for the Zeya hydroelectric plant
Online Contents | 1976
|