Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance
Railway construction work is carried out in developing or developed countries around the world. The railway was built as a means of mass transportation to support connectivity between places. Railway construction work is one of the complex construction projects. Construction accidents can hamper many work activities. It is not uncommon for construction accidents to occur in construction that affects people, property, public safety, and the environment. For this reason, it is necessary to identify and analyze the risk of hazards from the beginning to prevent the occurrence of these construction accidents. This study aims to identify the potential hazards in each work package by reviewing work methods, work activities, and WBS-based resources for standardized railway construction using a qualitative approach. This re-search is expected to produce safety risk sources with the highest potential hazards in the railway construction works. The risk of construction accidents can be reduced or even zero risks of construction accidents (zero accident) during construction project activities.
Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance
Railway construction work is carried out in developing or developed countries around the world. The railway was built as a means of mass transportation to support connectivity between places. Railway construction work is one of the complex construction projects. Construction accidents can hamper many work activities. It is not uncommon for construction accidents to occur in construction that affects people, property, public safety, and the environment. For this reason, it is necessary to identify and analyze the risk of hazards from the beginning to prevent the occurrence of these construction accidents. This study aims to identify the potential hazards in each work package by reviewing work methods, work activities, and WBS-based resources for standardized railway construction using a qualitative approach. This re-search is expected to produce safety risk sources with the highest potential hazards in the railway construction works. The risk of construction accidents can be reduced or even zero risks of construction accidents (zero accident) during construction project activities.
Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance
Lecture Notes in Civil Engineering
Kristiawan, Stefanus Adi (Herausgeber:in) / Gan, Buntara S. (Herausgeber:in) / Shahin, Mohamed (Herausgeber:in) / Sharma, Akanshu (Herausgeber:in) / Aryanto, D. V. (Autor:in) / Riantini, L. S. (Autor:in) / Machfudiyanto, R. A. (Autor:in) / Latief, Y. (Autor:in)
International Conference on Rehabilitation and Maintenance in Civil Engineering ; 2021 ; Surakarta, Indonesia
19.07.2022
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Taylor & Francis Verlag | 2015
|Using a Risk Breakdown Structure in project management
Emerald Group Publishing | 2003
|A RAILWAY GROUND HAZARD RISK ANALYSIS METHODOLOGY OVERVIEW
British Library Conference Proceedings | 2007
|The Application of Work Breakdown Structure in Project Implementation in Nigeria
BASE | 2016
|