Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Variation Order Management in Vietnam Construction Projects
Like other developing countries, Vietnam has a very complicated construction industry. There are frequent problems of inadequacies of design documentation, legal framework, as well as unexpected site conditions most likely happen. Moreover, numerous different parties involved in construction projects can result in a high risk of changes, which if not dealt with quickly, could develop into variation order, and then can affect the achievement of the project objectives. A clear understanding of VOs could potentially enhance the existing management process of construction projects. Therefore, objectives of this study are (a) to investigate the real cause of variation orders in order to take proactive measures, (b) to present some suggestions of practical ways to minimize this cause, hence improving the overall project performance.
Variation Order Management in Vietnam Construction Projects
Like other developing countries, Vietnam has a very complicated construction industry. There are frequent problems of inadequacies of design documentation, legal framework, as well as unexpected site conditions most likely happen. Moreover, numerous different parties involved in construction projects can result in a high risk of changes, which if not dealt with quickly, could develop into variation order, and then can affect the achievement of the project objectives. A clear understanding of VOs could potentially enhance the existing management process of construction projects. Therefore, objectives of this study are (a) to investigate the real cause of variation orders in order to take proactive measures, (b) to present some suggestions of practical ways to minimize this cause, hence improving the overall project performance.
Variation Order Management in Vietnam Construction Projects
Lecture Notes in Civil Engineering
Reddy, J. N. (Herausgeber:in) / Wang, Chien Ming (Herausgeber:in) / Luong, Van Hai (Herausgeber:in) / Le, Anh Tuan (Herausgeber:in) / Tran, Nam N. N. (Autor:in) / Do, Sy T. (Autor:in) / Nguyen, Thu A. (Autor:in) / Le, Long H. (Autor:in)
28.07.2020
8 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Variation Order Management in Vietnam Construction Projects
TIBKAT | 2020
|A Proposed Model for Variation Order Management in Construction Projects
DOAJ | 2024
|Estimating time performance for building construction projects in Vietnam
Springer Verlag | 2013
|Estimating time performance for building construction projects in Vietnam
Online Contents | 2013
|Robust process-based multi-project scheduling for construction projects in Vietnam
British Library Conference Proceedings | 2009
|