Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk Assessment of Shield Tunneling
Calculating from the Neolithic, the history of understanding and developing tunnels exceeds 10,000 years. TBM was invented after the First Industrial Revolution, and its functions as well as its risk-resisting capability have greatly enhanced by continuous innovations through the last two industrial revolutions.
Risk Assessment of Shield Tunneling
Calculating from the Neolithic, the history of understanding and developing tunnels exceeds 10,000 years. TBM was invented after the First Industrial Revolution, and its functions as well as its risk-resisting capability have greatly enhanced by continuous innovations through the last two industrial revolutions.
Risk Assessment of Shield Tunneling
Zhu, Weibin (Autor:in) / Ju, Shijian (Autor:in) / Wang, Hui (Autor:in)
Shield Tunneling Technology in Mixed Face Ground Conditions ; Kapitel: 3 ; 95-110
16.09.2022
16 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Risk Analysis of Subway Shield Tunneling
ASCE | 2017
|Quantified Risk Assessment of Shield Tunneling Effects on Urban Cement Concrete Pavement
British Library Conference Proceedings | 2011
|Mud concentration type shield tunneling construction method for shield tunneling machine
Europäisches Patentamt | 2015
|Engineering Index Backfile | 1904