Evaluating the Performance of Iraq Construction Projects Using Building Information Modelling Technique
Construction projects in Iraq face risks that have unique effects where it causes project stopping for long periods, sometimes for several years, and the actual cost of the project deviates from the cost of the planned project due to the weakness of the techniques used in the planning and design stage and the weakness in understanding the political, cultural and economic conditions of the country. This paper aims to evaluate the performance of construction projects in Iraq and to show the effect of these risks on the stages of project progress during the construction period through adopting an effective technique such as building information modeling and generating 4D model building to compare the between the actual work and the planned work for the project progress. The research methodology was applied in one of the completed Iraqi construction projects. The study concluded that 4D model generating is effective in evaluating the performance of construction and helps to understand the effect of risks on project activities progress and project completion time, also, the possibility of adopting this model as an evaluation program that helps the project managers to understand the performance of construction project before construction and avoiding risks. Project managers believe this model can contribute to controlling risks to a construction project and improving its performance.
Evaluating the Performance of Iraq Construction Projects Using Building Information Modelling Technique
Construction projects in Iraq face risks that have unique effects where it causes project stopping for long periods, sometimes for several years, and the actual cost of the project deviates from the cost of the planned project due to the weakness of the techniques used in the planning and design stage and the weakness in understanding the political, cultural and economic conditions of the country. This paper aims to evaluate the performance of construction projects in Iraq and to show the effect of these risks on the stages of project progress during the construction period through adopting an effective technique such as building information modeling and generating 4D model building to compare the between the actual work and the planned work for the project progress. The research methodology was applied in one of the completed Iraqi construction projects. The study concluded that 4D model generating is effective in evaluating the performance of construction and helps to understand the effect of risks on project activities progress and project completion time, also, the possibility of adopting this model as an evaluation program that helps the project managers to understand the performance of construction project before construction and avoiding risks. Project managers believe this model can contribute to controlling risks to a construction project and improving its performance.
Evaluating the Performance of Iraq Construction Projects Using Building Information Modelling Technique
Karkush, Mahdi O. (Herausgeber:in) / Choudhury, Deepankar (Herausgeber:in) / Kadume, Noor H. (Autor:in) / Naji, Hafeth I. (Autor:in)
Geotechnical Engineering and Sustainable Construction ; Kapitel: 55 ; 691-700
20.03.2022
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Building information modeling , Construction risk , 4D simulation , Construction project , Construction scheduling Engineering , Geoengineering, Foundations, Hydraulics , Geotechnical Engineering & Applied Earth Sciences , Transportation Technology and Traffic Engineering , Environment, general , Building Construction and Design
BASE | 2019
|DOAJ | 2019
|BASE | 2019
|Major factors contributing to the construction waste generation in building projects of Iraq
DOAJ | 2018
|