Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bi-directional Static Pile Load Test by S-Cell Method
Static load testing is a conventional technique for testing pile in which loads are applied on the top of the pile and generally known as ‘top-down testing’. This has been in practice from many years all over the world and has become a standard test for pile foundation. This method cannot be used when there is lack of space and high magnitude of load is to be applied for the pile test. There is a finite limit to the load capacity that can be applied with either kentledge, the use of reaction piles, or anchors, and as the load increases, the costs of whole assembly also increases. An attempt has been made in this study to adopt a new technique which would overcome all the large-scale problems associated with top-down testing technique. This method will divide the pile into two or more sections, and these can be loaded axially as required using a portion of the pile element as a reaction. Bi-directional static pile load test (S-Cell method) is economical and less time-consuming test as compared to conventional static load test. Therefore, bi-directional static pile load test can be considered as an alternative test for heavily loaded pile foundation in India.
Bi-directional Static Pile Load Test by S-Cell Method
Static load testing is a conventional technique for testing pile in which loads are applied on the top of the pile and generally known as ‘top-down testing’. This has been in practice from many years all over the world and has become a standard test for pile foundation. This method cannot be used when there is lack of space and high magnitude of load is to be applied for the pile test. There is a finite limit to the load capacity that can be applied with either kentledge, the use of reaction piles, or anchors, and as the load increases, the costs of whole assembly also increases. An attempt has been made in this study to adopt a new technique which would overcome all the large-scale problems associated with top-down testing technique. This method will divide the pile into two or more sections, and these can be loaded axially as required using a portion of the pile element as a reaction. Bi-directional static pile load test (S-Cell method) is economical and less time-consuming test as compared to conventional static load test. Therefore, bi-directional static pile load test can be considered as an alternative test for heavily loaded pile foundation in India.
Bi-directional Static Pile Load Test by S-Cell Method
Lecture Notes in Civil Engineering
Saride, Sireesh (Herausgeber:in) / Umashankar, B. (Herausgeber:in) / Avirneni, Deepti (Herausgeber:in) / Patidar, Vijay Kumar (Autor:in) / Kaur, Suneet (Autor:in) / Dindorkar, Nitin (Autor:in)
10.04.2020
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Load test , Bi-directional static load test (BDSLT) , Super cell , S-Cell , Foundation engineering , Equivalent curve Engineering , Geoengineering, Foundations, Hydraulics , Transportation Technology and Traffic Engineering , Geotechnical Engineering & Applied Earth Sciences , Remote Sensing/Photogrammetry
Bi-directional Static Pile Load Test by S-Cell Method
TIBKAT | 2020
|The Bi-directional Pile Load Test
British Library Conference Proceedings | 2007
|Pile arranging method for foundation pile static load test
Europäisches Patentamt | 2021
|Existing pile static load test method and test device
Europäisches Patentamt | 2024
|