Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
III Phase II Test Plan and Setup
The Phase II testing was intended to further study the potential for contribution of antifreeze solutions to fire conditions. The Phase II test plan was separated into two scopes. Scope A tested antifreeze solutions for the potential to create a large-scale ignition of the spray when discharged through sprinklers onto a fire. Scope B tested antifreeze solutions for their impact on a sprinkler system’s ability to control a fire condition and maintain tenable conditions.
III Phase II Test Plan and Setup
The Phase II testing was intended to further study the potential for contribution of antifreeze solutions to fire conditions. The Phase II test plan was separated into two scopes. Scope A tested antifreeze solutions for the potential to create a large-scale ignition of the spray when discharged through sprinklers onto a fire. Scope B tested antifreeze solutions for their impact on a sprinkler system’s ability to control a fire condition and maintain tenable conditions.
III Phase II Test Plan and Setup
SpringerBriefs in Fire
06.04.2012
9 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Pbf System Operation Test- Operations Phase Plan
NTIS | 1972
The Rotterdam sheet pile wall field test: Test setup
British Library Conference Proceedings | 2000
|Side Shear Setup. I: Test Piles Driven in Florida
British Library Online Contents | 2005
|New large test setup for dynamic testing of soils
British Library Conference Proceedings | 1995
|