Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Comparison of Erection Solutions for Steel Box Girders Spanning from Anchorage in the Sea on Shenzhen-Zhongshan Bridge
The non-navigable hole bridge in the east and west flooding area of the Shenzhen-Zhongshan Bridge 110 m continuous steel box girder system, each with 2 holes of steel box girders spanning the Lingdingyang Bridge sea anchor, which is affected by the anchor and the subsidiary structure, and its installation is difficult. In view of the characteristics of the project, three installation solutions were proposed: large section lifting, small section incremental launching and large section incremental launching. Combined with the comparative analysis of construction efficiency, temporary structure usage, equipment input and construction risk, the large section incremental launching solution not only has less temporary structure input and controllable construction period, but also avoids the input of new equipment and has the best comprehensive economy, which is recommended as the preferred solution for this project. The finite element analysis of the incremental launching process shows that the structural forces meet the requirements after local reinforcement, and the scheme is safe and feasible.
Bridge Comparison of Erection Solutions for Steel Box Girders Spanning from Anchorage in the Sea on Shenzhen-Zhongshan Bridge
The non-navigable hole bridge in the east and west flooding area of the Shenzhen-Zhongshan Bridge 110 m continuous steel box girder system, each with 2 holes of steel box girders spanning the Lingdingyang Bridge sea anchor, which is affected by the anchor and the subsidiary structure, and its installation is difficult. In view of the characteristics of the project, three installation solutions were proposed: large section lifting, small section incremental launching and large section incremental launching. Combined with the comparative analysis of construction efficiency, temporary structure usage, equipment input and construction risk, the large section incremental launching solution not only has less temporary structure input and controllable construction period, but also avoids the input of new equipment and has the best comprehensive economy, which is recommended as the preferred solution for this project. The finite element analysis of the incremental launching process shows that the structural forces meet the requirements after local reinforcement, and the scheme is safe and feasible.
Bridge Comparison of Erection Solutions for Steel Box Girders Spanning from Anchorage in the Sea on Shenzhen-Zhongshan Bridge
Lecture Notes in Civil Engineering
Yang, Yang (Herausgeber:in) / Xue, Zhi-Wu (Autor:in) / Guo, Qiang (Autor:in)
14.02.2023
13 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Quebec bridge girders and wind anchorage
Engineering Index Backfile | 1914
Erection of additional girders -- Williamsburg bridge towers
Engineering Index Backfile | 1909
Engineering Index Backfile | 1911
|Erection of the long plate girders of the Towanda bridge
Engineering Index Backfile | 1908
Steel Bridge Erection Practices
NTIS | 2005
|