Embankment Construction on Swampy Area Using Controlled Modulus Columns (CMC) for Standard Gauge Railway Project in Tanzania
The new Standard Gauge Railway (SGR) is a railway system in Tanzania, consisting of a 1,224-km-long single line with a design speed of 160 km/h and linking the country to the neighboring countries of Rwanda, Uganda, Burundi, and the Democratic Republic of Congo. The railway line alignment passes over some soft soil areas where the soil condition consisted of soft and organic clays with a high ground water table, which made the ground conditions swampy and required ground improvement prior to embankment construction. The chainage where the ground improvement is required involves a 6.5-m-high embankment and a culvert construction. The paper presents the design and construction procedures of the controlled modulus columns (CMC) to transfer the load of the foundation block onto a stiffer layer of soil or rock via load transfer platform. As a result, the settlement of the foundation block was reduced while increasing the bearing capacity.
Embankment Construction on Swampy Area Using Controlled Modulus Columns (CMC) for Standard Gauge Railway Project in Tanzania
The new Standard Gauge Railway (SGR) is a railway system in Tanzania, consisting of a 1,224-km-long single line with a design speed of 160 km/h and linking the country to the neighboring countries of Rwanda, Uganda, Burundi, and the Democratic Republic of Congo. The railway line alignment passes over some soft soil areas where the soil condition consisted of soft and organic clays with a high ground water table, which made the ground conditions swampy and required ground improvement prior to embankment construction. The chainage where the ground improvement is required involves a 6.5-m-high embankment and a culvert construction. The paper presents the design and construction procedures of the controlled modulus columns (CMC) to transfer the load of the foundation block onto a stiffer layer of soil or rock via load transfer platform. As a result, the settlement of the foundation block was reduced while increasing the bearing capacity.
Embankment Construction on Swampy Area Using Controlled Modulus Columns (CMC) for Standard Gauge Railway Project in Tanzania
Lecture Notes in Civil Engineering
Rujikiatkamjorn, Cholachat (Herausgeber:in) / Xue, Jianfeng (Herausgeber:in) / Indraratna, Buddhima (Herausgeber:in) / Karagoz, Lami (Autor:in) / Erdem, Altan (Autor:in) / Gokce, Hasan Burak (Autor:in)
International Conference on Transportation Geotechnics ; 2024 ; Sydney, NSW, Australia
25.10.2024
7 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Research on the Sustainability of the Standard Gauge Railway Construction Project in Tanzania
DOAJ | 2021
|Design and Monitoring of an Embankment on Controlled Modulus Columns
British Library Conference Proceedings | 2006
|Design and Monitoring of an Embankment on Controlled Modulus Columns
British Library Online Contents | 2006
|Controlled Modulus Columns (CMC) Foundation System for Embankment Support: A Case History
British Library Conference Proceedings | 2003
|Controlled Modulus Columns Supporting Approach Embankment for Clarence River Bridge at Harwood, NSW