Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Predicting labour productivity for formwork activities in high-rise building construction: a case study
Predicting labour productivity accurately in critical activities like formwork erection would enable management interventions to improve the site situations especially in the context of high-rise building construction. In this study, Artificial Neural Networks (ANNs) were employed to model and predict three categories of formwork erection activities–aluminium formwork, horizontal formwork and vertical formwork. 16 input factors were identified and a total of 19,344 data points from 42 construction sites all over India were used to train and validate the ANN models. The developed models show a high degree of accuracy in predicting the productivity on sites. The models also give major insights into the factors affecting the productivity of formwork related activities. The adverse effects of some factors like the number of workers on the site were also discussed. The study indicates the usefulness of data-driven techniques for prediction of labour productivity of formwork activities on Indian construction sites.
Predicting labour productivity for formwork activities in high-rise building construction: a case study
Predicting labour productivity accurately in critical activities like formwork erection would enable management interventions to improve the site situations especially in the context of high-rise building construction. In this study, Artificial Neural Networks (ANNs) were employed to model and predict three categories of formwork erection activities–aluminium formwork, horizontal formwork and vertical formwork. 16 input factors were identified and a total of 19,344 data points from 42 construction sites all over India were used to train and validate the ANN models. The developed models show a high degree of accuracy in predicting the productivity on sites. The models also give major insights into the factors affecting the productivity of formwork related activities. The adverse effects of some factors like the number of workers on the site were also discussed. The study indicates the usefulness of data-driven techniques for prediction of labour productivity of formwork activities on Indian construction sites.
Predicting labour productivity for formwork activities in high-rise building construction: a case study
Asian J Civ Eng
Bhilwade, Vijay (Autor:in) / Delhi, Venkata Santosh Kumar (Autor:in) / Nanthagopalan, Prakash (Autor:in) / Das, Amit Kumar (Autor:in) / Modi, Keyur (Autor:in)
Asian Journal of Civil Engineering ; 24 ; 959-968
01.06.2023
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Analysis of labour productivity of formwork operations in building construction
Online Contents | 2010
|Analysis of labour productivity of formwork operations in building construction
Emerald Group Publishing | 2010
|Analysis of labour productivity of formwork operations in building construction
British Library Online Contents | 2010
|Creeping formwork for high-rise building construction
Europäisches Patentamt | 2021
|Buildability factors affecting formwork labour productivity of building floors
British Library Online Contents | 2010
|