Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Consideration of the effect of a change of position of plumb lines at large hydro developments
Conclusion Reservoir filling causes a change in the positions of plumb lines at large hydro developments by 1″ and more. The corrections due to such changes exceed the accuracy of determining settlements and horizontal displacements of dams and their foundations and therefore must be taken into account.
Consideration of the effect of a change of position of plumb lines at large hydro developments
Conclusion Reservoir filling causes a change in the positions of plumb lines at large hydro developments by 1″ and more. The corrections due to such changes exceed the accuracy of determining settlements and horizontal displacements of dams and their foundations and therefore must be taken into account.
Consideration of the effect of a change of position of plumb lines at large hydro developments
Karlson, A. A. (Autor:in)
Hydrotechnical Construction ; 8 ; 257-259
01.03.1974
3 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Consideration of the effect of a change of position of plumb lines at large hydro developments
Online Contents | 1974
|Displacement of shaft plumb lines
Engineering Index Backfile | 1951
|Laser plumb line measuring device and laser plumb line measuring system
Europäisches Patentamt | 2020
|Electronic plumb bob demonstrated; yields data on pile's out-of-plumb
Engineering Index Backfile | 1951
|