Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aetiology and Progression of Construction Disputes towards a Predictive Model
Construction projects are at risk of dispute. Dispute prevention is thus expected to avoid that cost. This paper aims to establish a model predicting the occurrence of disputes and identifying strategies regarding resource allocation in dispute avoidance. Factors in the model were identified by a literature review and conceptualised into aetiology and progression of dispute formation based on an analogy with epidemiological investigations. The model structure was established upon this analogy, validated against Bradford Hill criteria, and then quantified by conducting a Bayesian network analysis with samples returned from a questionnaire survey. The model shows high accuracy rates with both complete and incomplete input data. Finally, a sensitivity analysis was conducted to simulate the results of potential management measures available to be taken. This predictive model not only serves the prediction function but also traces back to factors causing disputes, and hence can be used to assist decision making before and during a construction process. At the centre of the model sits the causal mechanism investigation, but the existing methods only shed lights on correlational research without causal consideration. This paper devised an epidemiological investigation which covers from causal proposition to causal examination and contributes greatly to model establishment.
Aetiology and Progression of Construction Disputes towards a Predictive Model
Construction projects are at risk of dispute. Dispute prevention is thus expected to avoid that cost. This paper aims to establish a model predicting the occurrence of disputes and identifying strategies regarding resource allocation in dispute avoidance. Factors in the model were identified by a literature review and conceptualised into aetiology and progression of dispute formation based on an analogy with epidemiological investigations. The model structure was established upon this analogy, validated against Bradford Hill criteria, and then quantified by conducting a Bayesian network analysis with samples returned from a questionnaire survey. The model shows high accuracy rates with both complete and incomplete input data. Finally, a sensitivity analysis was conducted to simulate the results of potential management measures available to be taken. This predictive model not only serves the prediction function but also traces back to factors causing disputes, and hence can be used to assist decision making before and during a construction process. At the centre of the model sits the causal mechanism investigation, but the existing methods only shed lights on correlational research without causal consideration. This paper devised an epidemiological investigation which covers from causal proposition to causal examination and contributes greatly to model establishment.
Aetiology and Progression of Construction Disputes towards a Predictive Model
KSCE J Civ Eng
Wang, Peipei (Autor:in) / Zhang, Lihan (Autor:in) / Wang, Kun (Autor:in) / Fenn, Peter (Autor:in)
KSCE Journal of Civil Engineering ; 25 ; 1131-1143
01.04.2021
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Anatomy of Construction Disputes
Online Contents | 2013
|Anatomy of Construction Disputes
British Library Online Contents | 2013
|Reducing design/construction disputes
British Library Online Contents | 1999
Anatomy of Construction Disputes
ASCE | 2012
|Risk, Construction Contracts and Construction Disputes
British Library Conference Proceedings | 1994
|