Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experience in preparing the rock foundation of the Dnestr hydroelectric station
Conclusions 1. The scheme used for preparing the foundation of the Dnestr hydrostation made it possible to eliminate jackhammer drilling and to reduce labor expenditures by 0.33 man-day/m2 of protected foundation and to preserve a sufficient strength and continuity of the rock foundation. 2. The scheme of works used can be used on the construction of other important hydraulic structures and can subsequently be reflected in the standards.
Experience in preparing the rock foundation of the Dnestr hydroelectric station
Conclusions 1. The scheme used for preparing the foundation of the Dnestr hydrostation made it possible to eliminate jackhammer drilling and to reduce labor expenditures by 0.33 man-day/m2 of protected foundation and to preserve a sufficient strength and continuity of the rock foundation. 2. The scheme of works used can be used on the construction of other important hydraulic structures and can subsequently be reflected in the standards.
Experience in preparing the rock foundation of the Dnestr hydroelectric station
Azarkovich, A. E. (Autor:in) / Shuifer, M. I. (Autor:in) / Tsvetkov, A. I. (Autor:in) / Gandzyuk, S. S. (Autor:in) / Budnikov, E. L. (Autor:in)
Hydrotechnical Construction ; 15 ; 459-461
01.08.1981
3 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Experience in preparing the rock foundation of the Dnestr hydroelectric station
Online Contents | 1981
|Transformation of releases in the lower pool of the dnestr hydroelectric station
Springer Verlag | 1991
|Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Springer Verlag | 1980
|Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Online Contents | 1980
|Deformation of the rock foundation of the Bratsk hydroelectric station
Springer Verlag | 1979
|