Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Measuring risk-associated activity’s duration: A fuzzy set theory application
Uncertainty is inherent in the construction projects. Appropriately determining a project schedule under uncertainty is one of the most important factors for a contractor’s success in a project. However, when the likelihood of incurring risk events and the riskassociated consequences are uncertain, contractors often face difficulties in estimating project duration. While the Critical Path Method (CPM) has been widely used in scheduling a project, it has been frequently criticized because it assumes an activity’s duration deterministic without reflecting uncertainty involved in a project schedule. The Program Evaluation and Review Technique (PERT) and the Monte Carlo Simulation (MCS) technique have been used to reinforce the shortcomings of the CPM through applying probabilistic analysis approach. They, however, still impose a problem of identifying probabilities under the circumstances where schedule variables cannot be defined as probabilistic nature. The main objective of this paper is to present an alternative schedule risk quantification method based on the fuzzy set theory for estimating a risk-associated activity’s duration. A hypothetical case study is prepared to show how the proposed method can be put into practice. Interviews with industry experts are also held to verify the usability as well as to identify the pros and cons of the method.
Measuring risk-associated activity’s duration: A fuzzy set theory application
Uncertainty is inherent in the construction projects. Appropriately determining a project schedule under uncertainty is one of the most important factors for a contractor’s success in a project. However, when the likelihood of incurring risk events and the riskassociated consequences are uncertain, contractors often face difficulties in estimating project duration. While the Critical Path Method (CPM) has been widely used in scheduling a project, it has been frequently criticized because it assumes an activity’s duration deterministic without reflecting uncertainty involved in a project schedule. The Program Evaluation and Review Technique (PERT) and the Monte Carlo Simulation (MCS) technique have been used to reinforce the shortcomings of the CPM through applying probabilistic analysis approach. They, however, still impose a problem of identifying probabilities under the circumstances where schedule variables cannot be defined as probabilistic nature. The main objective of this paper is to present an alternative schedule risk quantification method based on the fuzzy set theory for estimating a risk-associated activity’s duration. A hypothetical case study is prepared to show how the proposed method can be put into practice. Interviews with industry experts are also held to verify the usability as well as to identify the pros and cons of the method.
Measuring risk-associated activity’s duration: A fuzzy set theory application
KSCE J Civ Eng
Ock, Jong-Ho (Autor:in) / Han, Seung-Heon (Autor:in)
KSCE Journal of Civil Engineering ; 14 ; 663-671
01.09.2010
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
Trans Tech Publications | 2013
|Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
British Library Conference Proceedings | 2013
|Forecasting project duration using risk-based earned duration management
Taylor & Francis Verlag | 2022
|