Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quantifying Resource Inter-activity Utilization Efficiency Through Simulation-Based Scheduling
This research investigates resource inter-activity utilization efficiency arising from resource shared use and transfer observed in planning projects at a structural steel fabrication shop. Aided with discrete event simulation-based resource-constrained scheduling analysis, the necessity of defining the resource inter-activity utilization efficiency factor is justified in project scheduling and budgeting in practice. The Simplified Scheduling Simulation (S3) platform based on the simplified discrete-event simulation approach (SDESA) is utilized to create a resource loaded schedule for a simple project case in order to facilitate analyzing resource inter-activity utilization efficiency. Further, the problem of how to optimize labor inter-activity utilization efficiency is formulated conceptually, which is vitally important to project cost budgeting and earned value management in applications resembling operating a major steel fabrication facility.
Quantifying Resource Inter-activity Utilization Efficiency Through Simulation-Based Scheduling
This research investigates resource inter-activity utilization efficiency arising from resource shared use and transfer observed in planning projects at a structural steel fabrication shop. Aided with discrete event simulation-based resource-constrained scheduling analysis, the necessity of defining the resource inter-activity utilization efficiency factor is justified in project scheduling and budgeting in practice. The Simplified Scheduling Simulation (S3) platform based on the simplified discrete-event simulation approach (SDESA) is utilized to create a resource loaded schedule for a simple project case in order to facilitate analyzing resource inter-activity utilization efficiency. Further, the problem of how to optimize labor inter-activity utilization efficiency is formulated conceptually, which is vitally important to project cost budgeting and earned value management in applications resembling operating a major steel fabrication facility.
Quantifying Resource Inter-activity Utilization Efficiency Through Simulation-Based Scheduling
Lecture Notes in Civil Engineering
Toledo Santos, Eduardo (Herausgeber:in) / Scheer, Sergio (Herausgeber:in) / Zahedi, Leila (Autor:in) / Lu, Ming (Autor:in)
International Conference on Computing in Civil and Building Engineering ; 2020 ; São Paulo, Brazil
Proceedings of the 18th International Conference on Computing in Civil and Building Engineering ; Kapitel: 90 ; 1276-1287
14.07.2020
12 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Resource Inter-activity utilization efficiency factor , Simplified Scheduling Simulation (S3) , Project budgeting , Earned value management (EVM) , Cost estimate Engineering , Building Construction and Design , Cyber-physical systems, IoT , Data Engineering , Data Mining and Knowledge Discovery , Facility Management
Regional versus inter-regional efficiency in resource allocations
Online Contents | 1970
|Improving human resource utilization through performance-based management
British Library Conference Proceedings | 1994
|Simulation-Based Auction Protocol for Resource Scheduling Problems
British Library Online Contents | 2012
|