Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development of Novel Hybrid Artificial Intelligent Model for Optimizing Material Supply Chain in Construction Projects
On the construction site, the time is rushed so the managers are only concerned about human resources and construction methods to meet the schedule, while paying little attention to construction materials. Because of the lack of concern about material costs, the current cost management of managers is still not really effective. Therefore, this study proposes to use a novel Hybrid Artificial Intelligent Model (HAIM) to optimize the material supply chain save cost for construction contractors. The construction logistics planning method is utilized to find suitable material requirements as well as control the cost of construction materials. The validation analysis shows the advanced searchability of proposed model to traditional and model metaheuristic algorithms. Using HAIM, Managers can optimize construction costs through material demand planning; thereby increasing profits for the project and the company will increase its competitiveness in the construction market.
Development of Novel Hybrid Artificial Intelligent Model for Optimizing Material Supply Chain in Construction Projects
On the construction site, the time is rushed so the managers are only concerned about human resources and construction methods to meet the schedule, while paying little attention to construction materials. Because of the lack of concern about material costs, the current cost management of managers is still not really effective. Therefore, this study proposes to use a novel Hybrid Artificial Intelligent Model (HAIM) to optimize the material supply chain save cost for construction contractors. The construction logistics planning method is utilized to find suitable material requirements as well as control the cost of construction materials. The validation analysis shows the advanced searchability of proposed model to traditional and model metaheuristic algorithms. Using HAIM, Managers can optimize construction costs through material demand planning; thereby increasing profits for the project and the company will increase its competitiveness in the construction market.
Development of Novel Hybrid Artificial Intelligent Model for Optimizing Material Supply Chain in Construction Projects
Lecture Notes in Civil Engineering
Reddy, J. N. (Herausgeber:in) / Wang, Chien Ming (Herausgeber:in) / Luong, Van Hai (Herausgeber:in) / Le, Anh Tuan (Herausgeber:in) / Pham, Vu Hong Son (Autor:in) / Nguyen, Huynh Chi Duy (Autor:in)
21.09.2022
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Construction logistics planning model , Artificial intelligent , Inventory control , Optimize delivery schedules , Construction materials , Fuzzy logic Energy , Sustainable Architecture/Green Buildings , Structural Materials , Geotechnical Engineering & Applied Earth Sciences , Building Construction and Design , Construction Management , Environmental Policy , Engineering
Intelligent Virtual Construction Material Supply Chain Environment
British Library Conference Proceedings | 2002
|Optimizing Material Logistics Planning in Construction Projects
British Library Conference Proceedings | 2010
|Global material supply chain : procurement database for 3D printing construction projects
BASE | 2021
|