Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimization of Remedial Measures for Mitigation of Foundation Seepage in Earth Dam—A Case Study
Analysis by numerical modeling software PLAXIS 2D is carried out for the earth dam of Kurha-Vadhodha Islampur sinchan yojana, Maharashtra, India to optimize seepage remedial measures. Depending on the dam cross-sections and foundation stratification, four cases (A, B, C, and D) are analyzed. Results of analyses indicate that for design dam cross-sections, major seepage is occurring through dam foundation with total discharge quantities of 0.7102, 0.7738, 0.2699, and 0.7169 m3/day/m, respectively. As these values are more than the permissible limit, seepage mitigation measures are required to be adopted at site. To determine the most effective remedial measure, analyses are conducted with: (i) rock grouting, (ii) cutoff wall below CoT, and (iii) upstream horizontal blanket in combination with a 6 m deep cutoff wall. Trials are conducted with different depths of cutoff wall and different lengths of horizontal blanket for optimization. For each trial, efficacy is determined by comparing discharge quantity with the permissible limits. Results indicate that seepage discharge quantities with cutoff wall of depth 35 m, 30 m, 5 m and 15 m for cases A, B, C, and D are 0.1936, 0.1892, 0.1602 and 0.1751 m3/day/m, respectively; which are less than the upper permissible limit. Hence, cutoff wall of above depths is recommended as the most effective seepage remedial measure for the earth dam of Kurha-Vadhodha Islampur sinchan yojana.
Optimization of Remedial Measures for Mitigation of Foundation Seepage in Earth Dam—A Case Study
Analysis by numerical modeling software PLAXIS 2D is carried out for the earth dam of Kurha-Vadhodha Islampur sinchan yojana, Maharashtra, India to optimize seepage remedial measures. Depending on the dam cross-sections and foundation stratification, four cases (A, B, C, and D) are analyzed. Results of analyses indicate that for design dam cross-sections, major seepage is occurring through dam foundation with total discharge quantities of 0.7102, 0.7738, 0.2699, and 0.7169 m3/day/m, respectively. As these values are more than the permissible limit, seepage mitigation measures are required to be adopted at site. To determine the most effective remedial measure, analyses are conducted with: (i) rock grouting, (ii) cutoff wall below CoT, and (iii) upstream horizontal blanket in combination with a 6 m deep cutoff wall. Trials are conducted with different depths of cutoff wall and different lengths of horizontal blanket for optimization. For each trial, efficacy is determined by comparing discharge quantity with the permissible limits. Results indicate that seepage discharge quantities with cutoff wall of depth 35 m, 30 m, 5 m and 15 m for cases A, B, C, and D are 0.1936, 0.1892, 0.1602 and 0.1751 m3/day/m, respectively; which are less than the upper permissible limit. Hence, cutoff wall of above depths is recommended as the most effective seepage remedial measure for the earth dam of Kurha-Vadhodha Islampur sinchan yojana.
Optimization of Remedial Measures for Mitigation of Foundation Seepage in Earth Dam—A Case Study
Lecture Notes in Civil Engineering
Jose, Babu T. (Herausgeber:in) / Sahoo, Dipak Kumar (Herausgeber:in) / Shukla, Sanjay Kumar (Herausgeber:in) / Krishna, A. Murali (Herausgeber:in) / Thomas, Jimmy (Herausgeber:in) / Veena, V. (Herausgeber:in) / Edlabadkar, J. S. (Autor:in) / Samanta, Tanusree (Autor:in) / Khot, A. D. (Autor:in)
Indian Geotechnical Conference ; 2022 ; Kochi, India
Proceedings of the Indian Geotechnical Conference 2022 Volume 7 ; Kapitel: 30 ; 349-361
14.07.2024
13 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Remedial Measures to Seepage Problems in Earthen Embankments - Giritale Case Study
British Library Conference Proceedings | 1999
|Remedial measures for control of seepage from reservoir - a case study
British Library Conference Proceedings | 2006
|Low Cost Remedial Measures for Seepage Control
British Library Conference Proceedings | 1993
|POST CONSTRUCTION REMEDIAL MEASURES AGAINST SUSPECTED HIGH SEEPAGE IN AN EARTH DAM
Taylor & Francis Verlag | 2004
|Remedial measures to control seepage problems in the Kafrein dam, Jordan
Online Contents | 2002
|