Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Working tests on unit No. 2 at Serebryansk hydroelectric station 1 and unit No. 6 at Rybinsk hydroelectric station after major plant replacement on reconstruction
Working tests on unit No. 2 at Serebryansk hydroelectric station 1 and unit No. 6 at Rybinsk hydroelectric station after major plant replacement on reconstruction
Working tests on unit No. 2 at Serebryansk hydroelectric station 1 and unit No. 6 at Rybinsk hydroelectric station after major plant replacement on reconstruction
Nikol’skii, G. N. (Autor:in)
Hydrotechnical Construction ; 34 ; 110-111
01.03.2000
2 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Online Contents | 2000
|Reliable operating regimes of the rybinsk hydroelectric station turbines
Springer Verlag | 1974
|Reliable operating regimes of the rybinsk hydroelectric station turbines
Online Contents | 1974
|Experience with operation of the Rybinsk hydroelectric station hydropower equipment and structures
Springer Verlag | 1977
|