Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tevatron Operational Experiences
Abstract Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented.
Tevatron Operational Experiences
Abstract Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented.
Tevatron Operational Experiences
Norris, B. L. (Autor:in) / Theilacker, J. C. (Autor:in)
Supercollider 1 ; 321-328
01.01.1989
8 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Operational experiences with a low-energy house
Online Contents | 1995
|OPERATIONAL EXPERIENCES WITH MTU 2000 & 4000 SERIES
Online Contents | 1999
New Subway-trains for Munich - Operational experiences
British Library Online Contents | 2005
|Operational experiences with refractories at precalciner cement kilns
British Library Online Contents | 2005
|Experiences of Structural Health Monitoring in Operational Conditions
British Library Conference Proceedings | 2010
|