Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Replacement of Permanent Bridges After Floods in 2013
Abstract The paper deals about operation of Czech Army Engineer Corps in year 2013. There were three units of Czech Army participate in this operation. University of Defence, Military Geodetical and Hydrometeorological Office and 15 Engineer Brigade. The aim of this operation was to construct temporary bridge after flood. During this operation was used REACH-BACK concept between University of Defence and Geodetical and Hydrometeorological Office and between University of Defence and 15 Engineer Brigade. Communication and cooperation between these units was supported by Information portal of engineer corps. The portal works as a support element for REACH-BACK concept.
Replacement of Permanent Bridges After Floods in 2013
Abstract The paper deals about operation of Czech Army Engineer Corps in year 2013. There were three units of Czech Army participate in this operation. University of Defence, Military Geodetical and Hydrometeorological Office and 15 Engineer Brigade. The aim of this operation was to construct temporary bridge after flood. During this operation was used REACH-BACK concept between University of Defence and Geodetical and Hydrometeorological Office and between University of Defence and 15 Engineer Brigade. Communication and cooperation between these units was supported by Information portal of engineer corps. The portal works as a support element for REACH-BACK concept.
Replacement of Permanent Bridges After Floods in 2013
Benda, Martin (Autor:in)
08.12.2016
9 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 2008
|Floods damage bridges and buildings
British Library Online Contents | 2009
Engineering Index Backfile | 1949
|Vulnerability evaluation of scoured bridges under floods
Online Contents | 2017
|Vulnerability evaluation of scoured bridges under floods
Elsevier | 2016
|