Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the kettle rapids hydro development
Conclusions 1. The creation of a temporary village from ready-made house trailers and the buildings of the auxiliary enterprises from factory-made units is sensible in a little-inhabited permafrost region. 2. The use of a shelter over the powerhouse permitted concreting practically the year-round under rigorous climatic conditions. 3. Preparation of the foundations for embankments located on peat bogs and permafrost during the winter is the most rational for the given conditions.
Construction of the kettle rapids hydro development
Conclusions 1. The creation of a temporary village from ready-made house trailers and the buildings of the auxiliary enterprises from factory-made units is sensible in a little-inhabited permafrost region. 2. The use of a shelter over the powerhouse permitted concreting practically the year-round under rigorous climatic conditions. 3. Preparation of the foundations for embankments located on peat bogs and permafrost during the winter is the most rational for the given conditions.
Construction of the kettle rapids hydro development
Troitskii, A. A. (Autor:in) / Moiseev, I. S. (Autor:in)
Hydrotechnical Construction ; 9 ; 482-487
01.05.1975
6 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Construction of the kettle rapids hydro development
Online Contents | 1975
|Engineering Index Backfile | 1918
|Priest rapids hydro-electric project
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1958
|Whitehorse rapids power development
Engineering Index Backfile | 1960
|