Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study
Abstract Pre-grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone. Two important questions need to be answered during such an excavation. First, how should the grouting size be determined? Second, when should excavation begin after grouting? These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach, which would be preferable, has not yet been developed. To address these questions, we apply a recently proposed numerical approach known as discontinuity layout optimization, an efficient node-based upper bound limit analysis method. A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions, including soft soil and a fault zone. The factor of safety is used to quantitatively assess the stability of the tunnel section. The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated, thereby assisting designers by quantitatively assessing the effects of pre-grouting.
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study
Abstract Pre-grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone. Two important questions need to be answered during such an excavation. First, how should the grouting size be determined? Second, when should excavation begin after grouting? These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach, which would be preferable, has not yet been developed. To address these questions, we apply a recently proposed numerical approach known as discontinuity layout optimization, an efficient node-based upper bound limit analysis method. A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions, including soft soil and a fault zone. The factor of safety is used to quantitatively assess the stability of the tunnel section. The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated, thereby assisting designers by quantitatively assessing the effects of pre-grouting.
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study
Yan, Xiao (Autor:in) / Sun, Zizheng (Autor:in) / Li, Shucai (Autor:in) / Liu, Rentai (Autor:in) / Zhang, Qingsong (Autor:in) / Zhang, Yiming (Autor:in)
Frontiers of Structural and Civil Engineering ; 13 ; 1393-1404
21.10.2019
12 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Online Contents | 2018
|Stability of Large Parallel Tunnels Excavated in Weak Rocks: A Case Study
British Library Online Contents | 2017
|Stability of Large Parallel Tunnels Excavated in Weak Rocks: A Case Study
Online Contents | 2017
|Stability of Large Parallel Tunnels Excavated in Weak Rocks: A Case Study
Online Contents | 2017
|