AHP as a Tool for Prioritizing Factors Affecting Building Rehabilitation Cost Management in Iraq
With infrastructure and economic problems, Iraq has special challenges relative to managing building rehabilitation costs. This research aims to identify those factors and accurately determine the weights by using the Analytic Hierarchy Process as a prioritized tool. A literature review, case studies, consultations with experts, and questionnaires were used to identify and categorize 57 factors into six categories. The study offers useful insights for decision-makers in the construction industry by showcasing the efficacy of AHP in impartially evaluating the relative importance of these factors. Building characteristics are found to have the highest weight (0.306) in the results of the AHP analysis, highlighting their importance in cost management choices. Prioritizing elements for building rehabilitation cost management in Iraq also involves safety and environmental considerations (0.093), project management issues (0.170), design and bill of quantities issues (0.220), and planning and contract management elements (0.155).
AHP as a Tool for Prioritizing Factors Affecting Building Rehabilitation Cost Management in Iraq
With infrastructure and economic problems, Iraq has special challenges relative to managing building rehabilitation costs. This research aims to identify those factors and accurately determine the weights by using the Analytic Hierarchy Process as a prioritized tool. A literature review, case studies, consultations with experts, and questionnaires were used to identify and categorize 57 factors into six categories. The study offers useful insights for decision-makers in the construction industry by showcasing the efficacy of AHP in impartially evaluating the relative importance of these factors. Building characteristics are found to have the highest weight (0.306) in the results of the AHP analysis, highlighting their importance in cost management choices. Prioritizing elements for building rehabilitation cost management in Iraq also involves safety and environmental considerations (0.093), project management issues (0.170), design and bill of quantities issues (0.220), and planning and contract management elements (0.155).
AHP as a Tool for Prioritizing Factors Affecting Building Rehabilitation Cost Management in Iraq
Karkush, Mahdi (Herausgeber:in) / Choudhury, Deepankar (Herausgeber:in) / Fattah, Mohammed (Herausgeber:in) / Al-Shiblawi, Ayad Abbas Obaid (Autor:in) / Breesam, Hatem Khaleefah (Autor:in)
International Conference on Geotechnical Engineering Iraq ; 2024 ; Warith Al-Anbiyaa University, Karbala, Iraq
Current Trends in Civil Engineering and Engineering Sciences 2024, Vol 2 ; Kapitel: 31 ; 422-436
16.11.2024
15 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Factors Affecting Cost Management of Building Rehabilitation Project in Iraq
Springer Verlag | 2024
|Prioritizing Sanitary Sewers for Rehabilitation Using Least-Cost Classifiers
Online Contents | 2006
|Practical Tool for Prioritizing Rehabilitation and Preventive Maintenance in Pavements
British Library Online Contents | 2016
|Building a Defensible Framework for Prioritizing Water Main Rehabilitation and Replacement
British Library Conference Proceedings | 2012
|Investigating factors affecting feasibility study of construction projects in iraq