Construction contractor's claims analysis: An integrated system approach
In practice, attempts have been made to identify the cause of delays and to modify schedules, to incorporate revised durations and determine new project times. Professor of Construction Studies at Wolverhampton Polytechnic, UK, Frank Harris, and Sabah Alkass, Assistant Professor at Concordia University, Quebec, present an integrated computerized system that aids in the analysis of claims resulting from delays.
Construction contractor's claims analysis: An integrated system approach
In practice, attempts have been made to identify the cause of delays and to modify schedules, to incorporate revised durations and determine new project times. Professor of Construction Studies at Wolverhampton Polytechnic, UK, Frank Harris, and Sabah Alkass, Assistant Professor at Concordia University, Quebec, present an integrated computerized system that aids in the analysis of claims resulting from delays.
Construction contractor's claims analysis: An integrated system approach
Alkass, Sabah (Autor:in) / Harris, Frank (Autor:in)
Building Research & Information ; 19 ; 56-64
01.01.1991
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Claims management in the Egyptian industrial construction sector: a contractor's perspective
Emerald Group Publishing | 2008
|Claims management in the Egyptian industrial construction sector: a contractor's perspective
Online Contents | 2008
|Claims management in the Egyptian industrial construction sector: A contractor's perspective
Online Contents | 2008
|Construction services: a contractor's view
Wiley | 1982
|