Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Project schedule risk management through building information modelling
The complex and dynamic nature of construction projects, due to intricate design and involvement of several direct and indirect stakeholders, exposes them to various risks. These risks may cause cost and time overruns. A construction schedule is instrumental in monitoring the whole process. Past research has identified various factors causing project delays and several techniques have been developed to mitigate their effects. Recently, Building Information Modelling (BIM) is remarked as an efficient and reliable construction management tool. This study investigates the role of BIM in identifying schedule risks and providing an effective solution for schedule management. Thus, key project delay factors and their remedying BIM features have been studied through literature and primary data, and a factor-feature matrix is developed. To gauge the actual effectiveness of the studied aspects, a case study has been developed. It is found that BIM has a substantial impact on schedule management of construction projects.
Project schedule risk management through building information modelling
The complex and dynamic nature of construction projects, due to intricate design and involvement of several direct and indirect stakeholders, exposes them to various risks. These risks may cause cost and time overruns. A construction schedule is instrumental in monitoring the whole process. Past research has identified various factors causing project delays and several techniques have been developed to mitigate their effects. Recently, Building Information Modelling (BIM) is remarked as an efficient and reliable construction management tool. This study investigates the role of BIM in identifying schedule risks and providing an effective solution for schedule management. Thus, key project delay factors and their remedying BIM features have been studied through literature and primary data, and a factor-feature matrix is developed. To gauge the actual effectiveness of the studied aspects, a case study has been developed. It is found that BIM has a substantial impact on schedule management of construction projects.
Project schedule risk management through building information modelling
Sami Ur Rehman, Muhammad (Autor:in) / Thaheem, Muhammad Jamaluddin (Autor:in) / Nasir, Abdur Rehman (Autor:in) / Khan, Khurram Iqbal Ahmad (Autor:in)
International Journal of Construction Management ; 22 ; 1489-1499
17.05.2022
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Schedule Risk Management of Railway Station Project
British Library Conference Proceedings | 2014
|Improving construction schedule and cost information feedback in building information modelling
British Library Online Contents | 2014
|Improving construction schedule and cost information feedback in building information modelling
Online Contents | 2014
|Research on Schedule Risk of Prefabricated Building Project Based on Social Network Analysis
Springer Verlag | 2023
|