A fuzzy project buffer management algorithm: a case study in the construction of a renewable project
One of the major problems with projects is that they are not completed according to schedule. Uncertainty always exists at the heart of real-world project scheduling problems. This paper introduces a fuzzy project buffer management (FPBM) algorithm which is a combination of the adaptive procedure with resource tightness (APRT) and fuzzy failure mode and effects analysis (FFMEA) methods. This paper aims to present an efficient model for project buffer sizing by taking FFMEA into account to reach a more realistic schedule. In this research, for increasing the efficiency of the APRT method, the FFMEA technique is simultaneously applied with them. This research was carried out as a case study in a renewable energy (RE) project. The methodology of this research consists of two phases. The first phase is the implementation of the APRT buffer sizing method. In the second phase of the research methodology, the fuzzy FMEA method is implemented. To validate the proposed model, the results are compared to several buffer management models proposed recently. Also, the results were compared with the results of similar projects. The findings show that considering the fuzzy FMEA technique in the APRT method, a more realistic schedule was obtained in this project.
A fuzzy project buffer management algorithm: a case study in the construction of a renewable project
One of the major problems with projects is that they are not completed according to schedule. Uncertainty always exists at the heart of real-world project scheduling problems. This paper introduces a fuzzy project buffer management (FPBM) algorithm which is a combination of the adaptive procedure with resource tightness (APRT) and fuzzy failure mode and effects analysis (FFMEA) methods. This paper aims to present an efficient model for project buffer sizing by taking FFMEA into account to reach a more realistic schedule. In this research, for increasing the efficiency of the APRT method, the FFMEA technique is simultaneously applied with them. This research was carried out as a case study in a renewable energy (RE) project. The methodology of this research consists of two phases. The first phase is the implementation of the APRT buffer sizing method. In the second phase of the research methodology, the fuzzy FMEA method is implemented. To validate the proposed model, the results are compared to several buffer management models proposed recently. Also, the results were compared with the results of similar projects. The findings show that considering the fuzzy FMEA technique in the APRT method, a more realistic schedule was obtained in this project.
A fuzzy project buffer management algorithm: a case study in the construction of a renewable project
Zohrehvandi, Shakib (Autor:in) / Vanhoucke, Mario (Autor:in) / Khalilzadeh, Mohammad (Autor:in) / Amiri, Maghsoud (Autor:in) / Shadrokh, Shahram (Autor:in)
International Journal of Construction Management ; 23 ; 2134-2143
10.09.2023
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Project buffer sizing and dynamic buffer consumption algorithm in power generation construction
Emerald Group Publishing | 2021
|Construction Project Buffer Management in Scheduling Planning and Control
British Library Conference Proceedings | 2006
|Buffer Sizing in Construction Scheduling Using Critical Chain Project Management
Springer Verlag | 2022
|MDM-Based Buffer Estimation in Construction Project
TIBKAT | 2018
|