Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A Combined Dry Jet Mixing-Prefabricated Vertical Drain Method for Soft Ground Improvement: A Case Study
A remarkable combined dry jet mixing (DJM) and prefabricated vertical drains (PVDs) method was used to enhance the performance for soft ground improvement. In the combined method, PVDs are first installed and then DJM columns are installed between the PVDs at larger spacing. This combined method improves the effectiveness of the ground improvement and creates a more economical solution. This paper presents a case study of the combined method for marine clay improvement in Lianyugang of China. The excess pore water pressure in soils created by the installation of DJM columns with and without PVDs was monitored and compared. In situ standard penetration tests were conducted in the DJM columns and before-and-after piezocone penetration tests were performed in soils surrounding the columns. Long-term settlement monitoring under embankment loading was carried out for the ground improved by combined method and DJM method alone. The field tests, settlement monitoring and economic benefit analysis results demonstrated that the DJM-PVD method is technologically sound and cost-effective as compared with the conventional DJM method.
A Combined Dry Jet Mixing-Prefabricated Vertical Drain Method for Soft Ground Improvement: A Case Study
A remarkable combined dry jet mixing (DJM) and prefabricated vertical drains (PVDs) method was used to enhance the performance for soft ground improvement. In the combined method, PVDs are first installed and then DJM columns are installed between the PVDs at larger spacing. This combined method improves the effectiveness of the ground improvement and creates a more economical solution. This paper presents a case study of the combined method for marine clay improvement in Lianyugang of China. The excess pore water pressure in soils created by the installation of DJM columns with and without PVDs was monitored and compared. In situ standard penetration tests were conducted in the DJM columns and before-and-after piezocone penetration tests were performed in soils surrounding the columns. Long-term settlement monitoring under embankment loading was carried out for the ground improved by combined method and DJM method alone. The field tests, settlement monitoring and economic benefit analysis results demonstrated that the DJM-PVD method is technologically sound and cost-effective as compared with the conventional DJM method.
A Combined Dry Jet Mixing-Prefabricated Vertical Drain Method for Soft Ground Improvement: A Case Study
Dingwen, Zhang (Autor:in) / Songyu, Liu (Autor:in) / Wenjun, Han (Autor:in) / Guangyin, Du (Autor:in)
Marine Georesources & Geotechnology ; 31 ; 332-347
01.10.2013
16 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Improvement of Pond Ash with Prefabricated Vertical Drain
British Library Conference Proceedings | 2007
|